Wondering how long your kitchen remodel will actually take? Here's a realistic week-by-week timeline — and the things that most often push it longer — from a contractor who runs kitchen remodels across Richmond every week.

A kitchen remodel in Richmond typically takes 3 to 6 weeks from demo to final walkthrough — but that number swings a lot depending on scope, material lead times, and whether you're changing the layout. Here's a realistic, week-by-week breakdown of what actually happens.
| Scope | Typical Timeline |
|---|---|
| Cosmetic refresh (cabinet refacing, new counters/backsplash, no layout change) | 1 – 2 weeks |
| Mid-range remodel (new cabinets, counters, flooring, lighting) | 3 – 6 weeks |
| Full gut renovation (layout change, plumbing/electrical relocation) | 6 – 9 weeks |
We give you a realistic, written schedule before any demo starts — and manage every trade in-house so nothing falls through the cracks.
Pro tip: the single biggest lever you control on your own timeline is how fast you finalize decisions. A homeowner who picks cabinets, counters, and tile in the first design meeting can shave 2–3 weeks off the whole project compared to one who's still deciding after demo starts.